Back to All Modules
Risk & COSHH

Method Statements

Safe system of work documentation detailing step-by-step procedures, PPE requirements, emergency arrangements, and permit linkage.

What is Method Statements?

Method statements transform risk assessments into practical working instructions that frontline workers can follow. This module provides a structured approach to documenting safe systems of work for high-risk activities, ensuring consistency and legal defensibility.

A method statement will typically split each task into a series of steps, identify the hazards associated with each step, specify the controls to be put in place and PPE to be used and the necessary competencies. Method statements can be mapped to risk assessments to make sure the hazards match those documented in the method statement.

Version control allows the capturing of change over time. The distribution features of the system allow workers to acknowledge they have received and read the most recent procedures. Digital signatures allow the worker to verify understanding before work begins, which provides audit evidence of briefing and instruction.

Regulatory Compliance

  • • Health and Safety at Work Act 1974 Section 2(2)(a)
  • • Management of Health and Safety at Work Regulations 1999
  • • Construction (Design and Management) Regulations 2015
  • • ISO 45001:2018 Clause 8.1.2 - Eliminating hazards and reducing OH&S risks
Method Statements Workflow1
Select activity template or create new method statement from scratch
2
Document step-by-step procedures with hazards identified at each stage
3
Specify control measures, PPE, and competency requirements
4
Link related risk assessments, permits, and COSHH assessments
5
Issue to workers with digital acknowledgment before work commences

Key Benefits

Standardised safe procedures reduce human error and incidents

Clear instructions improve contractor and temporary worker safety

Legal compliance with documented safe systems of work

Audit trail proves workers were briefed on safe methods

Version control ensures workers access current procedures

Integration with permits ensures high-risk work is properly controlled

Features & Capabilities

Step-by-step procedure builder with hazard mapping

PPE and competency requirement specification

Emergency procedure and rescue arrangement documentation

Risk assessment and permit cross-referencing

Template library for common activities

Version control and change management

Digital briefing and worker acknowledgment

Photo and diagram attachment for visual clarity

How It Works

1

Select activity template or create new method statement from scratch

2

Document step-by-step procedures with hazards identified at each stage

3

Specify control measures, PPE, and competency requirements

4

Link related risk assessments, permits, and COSHH assessments

5

Issue to workers with digital acknowledgment before work commences

Frequently asked questions

What is Method Statements?
Safe system of work documentation detailing step-by-step procedures, PPE requirements, emergency arrangements, and permit linkage.
How does Method Statements work?
Select activity template or create new method statement from scratch. Document step-by-step procedures with hazards identified at each stage. Specify control measures, PPE, and competency requirements. Link related risk assessments, permits, and COSHH assessments. Issue to workers with digital acknowledgment before work commences.
What are the main benefits of Method Statements?
Standardised safe procedures reduce human error and incidents. Clear instructions improve contractor and temporary worker safety. Legal compliance with documented safe systems of work. Audit trail proves workers were briefed on safe methods.
Which regulations does Method Statements help you comply with?
Health and Safety at Work Act 1974 Section 2(2)(a). Management of Health and Safety at Work Regulations 1999. Construction (Design and Management) Regulations 2015. ISO 45001:2018 Clause 8.1.2 - Eliminating hazards and reducing OH&S risks.

Ready to Use Method Statements?

Start managing your health and safety with our comprehensive solution.

30-day free trial · Cancel anytime

We value your privacy

We use cookies to enhance your browsing experience, analyze site traffic, and personalize content. By clicking "Accept All", you consent to our use of cookies.